Irons in the fire
I'm home today with a (not so) sick Boo and decided to take advantage of the lovely weather to get some photos of the current works in progress. There are many.
A new blanket for Devil, to replace the one lost a few weeks ago. I'm through the first border and staring down the barrel of 120+ rows of mindless blue and white intarsia. I'm already pretty certain that I hate intarsia. This is not going to be pretty.
Ivy, 90% seamed, ties done (note: I did not knit the required 52" because then they would be dragging on the ground), neckband left to be knit. The pattern calls for the neckband to be knit separately and then sewn in, but I'd rather knit it to the sweater as I go. Need to think about that a bit more.
The rest of Cricket, my first installment of the Hello Yarn Fiber Club almost a year ago (May 2007). I'm halfway through the hunk I had left over.
Socks for Devil from the Rainbow sock leftovers (there were lots of leftovers, 30+ grams). I started these while waiting for my Blue Moon package, but they are now on hold for a while. There are also the StR socks, of which I've managed to knit and rip most of the foot. Hmmm...hopefully I'll have something finished soon!
A new blanket for Devil, to replace the one lost a few weeks ago. I'm through the first border and staring down the barrel of 120+ rows of mindless blue and white intarsia. I'm already pretty certain that I hate intarsia. This is not going to be pretty.
Ivy, 90% seamed, ties done (note: I did not knit the required 52" because then they would be dragging on the ground), neckband left to be knit. The pattern calls for the neckband to be knit separately and then sewn in, but I'd rather knit it to the sweater as I go. Need to think about that a bit more.
The rest of Cricket, my first installment of the Hello Yarn Fiber Club almost a year ago (May 2007). I'm halfway through the hunk I had left over.
Socks for Devil from the Rainbow sock leftovers (there were lots of leftovers, 30+ grams). I started these while waiting for my Blue Moon package, but they are now on hold for a while. There are also the StR socks, of which I've managed to knit and rip most of the foot. Hmmm...hopefully I'll have something finished soon!